5 Reasons Automation Quotes for the Same Job Differ
When two automation quotes for the same job come back far apart, the difference almost always lives in scope and assumptions: what's included, what the vendor assumed about your parts and your site, what record the system has to keep, and what happens after commissioning.

GUIDE
Most manufacturers who have bought automation have seen it: two quotes for what looks like the same system, far enough apart that one of them must be wrong. Usually neither is. They're quoting different projects that happen to share a title, so before you pick the cheaper number, find out which project each vendor priced.
Scope lines that are easy to miss
Install and commissioning. Guarding and the risk assessment. Controls integration into your line. Operator training. Spare parts. Freight. Documentation. Each one can sit inside one quote and outside the other, and anything left out still has to be bought later. Ask each vendor for the same explicit list and the gap usually shrinks or explains itself.
Assumptions about your parts and your site
Every quote is priced against assumptions: parts arrive oriented or in bins, the floor has air and power where the cell needs it, your PLC (the line's controller) speaks a protocol the new system supports, changeover happens once a week or once an hour. When an assumption turns out wrong, the price moves after you've signed the order. The vendor who asked you more questions before quoting is usually the one whose number still holds at commissioning.
The record the system has to keep
Documentation and traceability requirements, common in medical, aerospace, and automotive work, add engineering that an identical-looking system without them doesn't carry. Two quotes can differ by the cost of proving the system does what it claims. If your project has that requirement, the quote that leaves it out is the one to question.
Headroom and growth
One vendor quoted the rate you asked for. Another quoted that rate plus room to grow: a bigger frame, a faster mechanism, capacity you may want in two years. Neither did anything wrong. Decide how much headroom you want before you compare the two.
What happens after commissioning
Support is part of the price whether or not it's on the quote. Local engineers who can be on your floor, spare parts availability, and who answers the phone in year three are real differences between vendors that a purchase-price comparison can't see. Ask where support comes from, and from whom.
When the cheaper quote is the right one
Sometimes the cheaper quote is simply the right one. When the scopes match and the assumptions hold, take it. This guide only argues for comparing projects before comparing numbers.
You leave with a checklist that lines two automation quotes up by scope and assumptions, so the numbers you compare mean the same thing.
WHAT WE REPRESENT
The lines M6 represents for this application
- Every line we carry is on the partners page, each with what it does best.
KEEP READING
Related guides and pages
- What a Supplier Needs to Quote Your Automation Project
- 5 Things That Set the Price of a Parts Feeding System
- How Much Does a Robot Cell Cost? 5 Costs Beyond the Arm
- How to Budget an Assembly Press: Manual, Pneumatic, or Servo
- Technical Services
- How to Automate High-Mix, Low-Volume Production Without Betting the Shop
- Modular vs Engineered Conveyor: Which Costs Less Over Its Life?
COMMON QUESTIONS
Common questions
How do I compare automation quotes fairly?
Ask every vendor to state the same scope list: install, commissioning, guarding, integration, training, documentation, support. Then compare their assumptions about how parts arrive and what the system has to prove. Compare the numbers last.
What should I send M6 for a budgetary number?
The part or a drawing, what has to happen to it, the rate, and any documentation requirement. Small, fast projects are welcome to state a target budget and timeline up front. The full checklist is in What a Supplier Needs to Quote Your Automation Project.
What should a budgetary number include?
The scope it covers, the assumptions it rests on, and what it leaves out, so you can see what the number buys. Ours comes with the scope written out.
