top of page

Field Guides From the Bench

Plain-English answers to the engineering decisions we get asked about. Each guide teaches one decision you can act on today, and it stays updated in place. For company news and project write-ups, see Field Notes.

How to Choose a Conveyor: Load, Layout, and Throughput

Conveying

How to Choose a Conveyor: Load, Layout, and Throughput

Bowl Feeder or Flexible Feeder? Five Questions Decide It

Parts Feeding

Bowl Feeder or Flexible Feeder? Five Questions Decide It

Why Bowl Feeders Fail in ISO 5 Cleanrooms

Parts Feeding

Why Bowl Feeders Fail in ISO 5 Cleanrooms

Light Curtain, Area Scanner, or Fixed Guard?

Safety & Guarding

Light Curtain, Area Scanner, or Fixed Guard?

Modular or Engineered Conveyor? The Real Total Cost

Conveying

Modular or Engineered Conveyor? The Real Total Cost

Flexible Feeding for Medical-Device and Cleanroom Assembly: How to Choose

Parts Feeding

Flexible Feeding for Medical-Device and Cleanroom Assembly: How to Choose

How to Spec Press Force (and Get a Ballpark You Can Take to Management)

Pressing & Fastening

How to Spec Press Force (and Get a Ballpark You Can Take to Management)

Automating High-Mix, Low-Volume Production Without Betting the Shop

Strategy

Automating High-Mix, Low-Volume Production Without Betting the Shop

How to Size a Vacuum Gripper (and the Acceleration Nobody Calculates)

Gripping

How to Size a Vacuum Gripper (and the Acceleration Nobody Calculates)

How to Choose a Flexible Feeder: 5 Questions to Ask First

Parts Feeding

How to Choose a Flexible Feeder: 5 Questions to Ask First

When Does Automated Screwdriving Pay Off? The 20,000-Screw Rule

Pressing & Fastening

When Does Automated Screwdriving Pay Off? The 20,000-Screw Rule

THE COST OF WAITING

What to put next to the equipment cost

The equipment quote is the easy half. These are the lines that usually go missing, and you are the only one who can fill them in:

Labor on the task. Hours per shift, at your fully loaded rate.

The rate ceiling. What the manual step caps your throughput at.

Scrap and rework. What manual variation costs you per thousand parts.

Changeover. Time lost every time the part changes.

The hiring problem. Turnover, training, and the weeks the job sits open.

Exposure. Repetitive lift, pinch points, and what one recordable costs you.

We will give you the equipment side early enough that it can sit in the same document.

bottom of page